01_Brickline_NorthConnector_120_IntersectionOblique_4K_COMPRESSED

North Connector Construction Bid Opportunities

In August 2026, Great Rivers Greenway will issue two bidding opportunities for construction of the Brickline Greenway, for a shared-use path on the west side of Spring Avenue from Page to Lindell Boulevards, totaling 0.7-miles between the two projects. Bids are due September 24th. 

Join our Pre-Bid Meeting on Thursday, September 3rd from 10:30-11:30am to learn about the project and form your teams!

This hybrid meeting will be held with Q&A to present project information, answer questions, and encourage vendors to team together to represent the diversity of our St. Louis region.

In person: Great Rivers Greenway office, 3745 Foundry Way, Suite 253, St. Louis, MO 63110
Online: https://us02web.zoom.us/j/85793124835

Vendors of all sizes and experience levels are strongly encouraged to attend. We invite everyone to participate in this meeting fully! Contact us to request accommodations (prefer 3 days’ notice): info@grgstl.org or 314-436-7009

 

 

 

 

 

 

 

 

 

 

 

 

Click here to view the TWO different bid opportunities (once posted August 27th) and to sign up for email alerts about vendor opportunities.

BRICKLINE GREENWAY NORTH CONNECTOR PHASE 2
Project: 308s (1 of 2)
TAP# 9901(688) / CDBG# B-23-CP-MO-0886 

0.45-mile urban greenway extension consisting of a shared-use path and roadway reconfiguration, continuing the North Connector phase 1 improvements currently under construction.   

Location: N SPRING AVE (Page to Washington – west side) 

Improvements include but are not limited to: 

  • Traffic Control 
  • Site Preparation, Removals, and Earthwork 
  • Concrete and Asphalt roadway patching and Pavement Markings 
  • Concrete (pavement, pavers, curb, ADA ramps, seatwalls, foundations) 
  • Stonework (salvaged street curb, seatwall, pavers) 
  • Traffic Signals/Interconnect 
  • Electrical (street and pedestrian lighting, wifi) 
  • Utilities (water, sewer) 
  • Landscaping (soil, trees, plants, lawn) 
  • Irrigation 
  • Site Furnishings  
  • Trail Signage 

BRICKLINE GREENWAY NORTH CONNECTOR PHASE 3
Project: 308s (2 of 2)
TAP# 5401(721)) / CDBG# B-23-CP-MO-0886 

0.25-mile urban greenway extension consisting of a shared-use path and roadway reconfiguration, continuing the North Connector phase 2 improvements being bid separately. 

Location: N SPRING AVE (Washington to Lindell – west side) 

Improvements include but are not limited to: 

  • Traffic Control 
  • Site Preparation, Removals, and Earthwork 
  • Concrete and Asphalt roadway patching and Pavement Markings 
  • Concrete (pavement, pavers, curb, ADA ramps) 
  • Stonework (salvaged street curb, seatwall, pavers) 
  • Traffic Signals/Interconnect 
  • Electrical (street and pedestrian lighting, wifi) 
  • Utilities (water, sewer) 
  • Landscaping (soil, trees, plants, lawn) 
  • Irrigation 
  • Site Furnishings  
  • Trail Signage
     

Download the event flyer and help spread the word!
(English & Español)