North Connector Construction Bid Opportunities
In August 2026, Great Rivers Greenway will issue two bidding opportunities for construction of the Brickline Greenway, for a shared-use path on the west side of Spring Avenue from Page to Lindell Boulevards, totaling 0.7-miles between the two projects. Bids are due September 24th.
Join our Pre-Bid Meeting on Thursday, September 3rd from 10:30-11:30am to learn about the project and form your teams!
This hybrid meeting will be held with Q&A to present project information, answer questions, and encourage vendors to team together to represent the diversity of our St. Louis region.
In person: Great Rivers Greenway office, 3745 Foundry Way, Suite 253, St. Louis, MO 63110
Online: https://us02web.zoom.us/j/85793124835
Vendors of all sizes and experience levels are strongly encouraged to attend. We invite everyone to participate in this meeting fully! Contact us to request accommodations (prefer 3 days’ notice): info@grgstl.org or 314-436-7009

BRICKLINE GREENWAY NORTH CONNECTOR PHASE 2
Project: 308s (1 of 2)
TAP# 9901(688) / CDBG# B-23-CP-MO-0886
0.45-mile urban greenway extension consisting of a shared-use path and roadway reconfiguration, continuing the North Connector phase 1 improvements currently under construction.
Location: N SPRING AVE (Page to Washington – west side)
Improvements include but are not limited to:
- Traffic Control
- Site Preparation, Removals, and Earthwork
- Concrete and Asphalt roadway patching and Pavement Markings
- Concrete (pavement, pavers, curb, ADA ramps, seatwalls, foundations)
- Stonework (salvaged street curb, seatwall, pavers)
- Traffic Signals/Interconnect
- Electrical (street and pedestrian lighting, wifi)
- Utilities (water, sewer)
- Landscaping (soil, trees, plants, lawn)
- Irrigation
- Site Furnishings
- Trail Signage
BRICKLINE GREENWAY NORTH CONNECTOR PHASE 3
Project: 308s (2 of 2)
TAP# 5401(721)) / CDBG# B-23-CP-MO-0886
0.25-mile urban greenway extension consisting of a shared-use path and roadway reconfiguration, continuing the North Connector phase 2 improvements being bid separately.
Location: N SPRING AVE (Washington to Lindell – west side)
Improvements include but are not limited to:
- Traffic Control
- Site Preparation, Removals, and Earthwork
- Concrete and Asphalt roadway patching and Pavement Markings
- Concrete (pavement, pavers, curb, ADA ramps)
- Stonework (salvaged street curb, seatwall, pavers)
- Traffic Signals/Interconnect
- Electrical (street and pedestrian lighting, wifi)
- Utilities (water, sewer)
- Landscaping (soil, trees, plants, lawn)
- Irrigation
- Site Furnishings
- Trail Signage