Project Updates
North Connector Construction Bid Opportunities
In January 2025, Great Rivers Greenway will issue a bidding opportunity for construction of the Brickline Greenway consisting of a 1.3-mile shared-use path and roadway reconfiguration from Fairground Park to Page Boulevard.
Join our Contractor Event on January 7 to learn about the project and form your teams!
An in-person mixer will be held with Q&A to present project information, answer questions, and encourage vendors to team together to exceed our federal Disadvantaged Business Enterprise (DBE) goals and represent the diversity of our St. Louis region.
Tuesday, January 7, from 7:30-9:00am – Presentation at 8:00am, followed by Q&A and contractor networking
Herbert Hoover Boys & Girls Club – 2901 N. Grand Blvd., St. Louis, MO 63107
Vendors of all sizes and experience levels are strongly encouraged to attend.
This opportunity includes two different bid packages.
BRICKLINE GREENWAY NORTH CONNECTOR PHASE 1 – RAISE# 693JJ32440255
1.3-mile urban greenway consisting of a shared-use path and roadway reconfiguration from Fairground Park to Page Boulevard
Location:
- N GRAND BLVD (Natural Bridge to Cass – west side)
- CASS AVE (Grand to Spring – south side)
- N SPRING AVE (Cass to Page – west side)
Project improvements include but are not limited to:
- Traffic Control
- Site Preparation, Removals, and Earthwork
- Asphalt patching and pavement markings
- Concrete (pavement, pavers, curb, ADA ramps, seatwall, foundations)
- Stonework (salvaged street curb, seatwall, pavers)
- Traffic Signals/Interconnect
- Electrical (street and pedestrian lighting, wifi)
- Utilities (water, sewer)
- Landscaping (soil, trees, plants, lawn)
- Irrigation
- Site Furnishings
- Trail Signage
GRAND AND CASS AVENUE CORRIDOR IMPROVEMENTS – STBG-5617(605) and CMAQ-5617(606)
The North Grand and Cass Corridor Improvement is a corridor reconstruction that complements the adjacent Brickline Greenway project on the opposite side of the roads to create a Complete Street. Improvements are intended to improve road conditions and safety, while providing additional infrastructure updates and amenities.
Location:
- N GRAND BLVD (Natural Bridge to Cass – east side)
- CASS AVE (Grand to Spring – north side)
Project improvements include but are not limited to:
- Traffic Control
- Site Preparation, Removals, and Earthwork
- Concrete (pavement, pavers, curb, ADA ramps, stairs, foundations)
- Stonework (salvaged street curb, planter curb, pavers, veneer)
- Traffic Signals/Interconnect
120 ROW Brickline_North Connector Bid Opportunties
100 ROW_Brickline North Connector Bid Opportunities