In January 2025, Great Rivers Greenway will issue a bidding opportunity for construction of the Brickline Greenway consisting of a 1.3-mile shared-use path and roadway reconfiguration from Fairground Park to Page Boulevard.

 

Join our Contractor Event on January 7 to learn about the project and form your teams!

An in-person mixer will be held with Q&A to present project information, answer questions, and encourage vendors to team together to exceed our federal Disadvantaged Business Enterprise (DBE) goals and represent the diversity of our St. Louis region.

     Tuesday, January 7, from 7:30-9:00am – Presentation at 8:00am, followed by Q&A and contractor networking

     Herbert Hoover Boys & Girls Club – 2901 N. Grand Blvd., St. Louis, MO 63107

Vendors of all sizes and experience levels are strongly encouraged to attend.

 

Phase 1-proj location map

 

This opportunity includes two different bid packages.

Click here to view the bid opportunity (once it is posted) and to sign up for email alerts about vendor opportunities.

 

 

BRICKLINE GREENWAY NORTH CONNECTOR PHASE 1 – RAISE# 693JJ32440255

1.3-mile urban greenway consisting of a shared-use path and roadway reconfiguration from Fairground Park to Page Boulevard  

Location: 

  • N GRAND BLVD (Natural Bridge to Cass – west side) 
  • CASS AVE (Grand to Spring – south side) 
  • N SPRING AVE (Cass to Page – west side) 

Project improvements include but are not limited to: 

  • Traffic Control 
  • Site Preparation, Removals, and Earthwork 
  • Asphalt patching and pavement markings 
  • Concrete (pavement, pavers, curb, ADA ramps, seatwall, foundations) 
  • Stonework (salvaged street curb, seatwall, pavers) 
  • Traffic Signals/Interconnect 
  • Electrical (street and pedestrian lighting, wifi) 
  • Utilities (water, sewer) 
  • Landscaping (soil, trees, plants, lawn) 
  • Irrigation 
  • Site Furnishings  
  • Trail Signage 

 

GRAND AND CASS AVENUE CORRIDOR IMPROVEMENTS  – STBG-5617(605) and CMAQ-5617(606) 

The North Grand and Cass Corridor Improvement is a corridor reconstruction that complements the adjacent Brickline Greenway project on the opposite side of the roads to create a Complete Street.   Improvements are intended to improve road conditions and safety, while providing additional infrastructure updates and amenities. 

Location: 

  • N GRAND BLVD (Natural Bridge to Cass – east side) 
  • CASS AVE (Grand to Spring – north side) 

Project improvements include but are not limited to: 

  • Traffic Control 
  • Site Preparation, Removals, and Earthwork 
  • Concrete (pavement, pavers, curb, ADA ramps, stairs, foundations) 
  • Stonework (salvaged street curb, planter curb, pavers, veneer) 
  • Traffic Signals/Interconnect 

 

120 ROW Brickline_North Connector Bid Opportunties

 

100 ROW_Brickline North Connector Bid Opportunities

 

 

Click here to download the event flyer below and help spread the word!

Brickline Construction Event Flyer_ENG_Final