{"id":492,"date":"2018-07-02T14:25:56","date_gmt":"2018-07-02T14:25:56","guid":{"rendered":"https:\/\/grgrebuildstg.wpenginepowered.com\/design\/required-front-end-drawings-addition-design-drawings\/"},"modified":"2026-03-19T16:46:14","modified_gmt":"2026-03-19T21:46:14","slug":"required-front-end-drawings-addition-design-drawings","status":"publish","type":"page","link":"https:\/\/greatriversgreenway.org\/design\/required-front-end-drawings-addition-design-drawings\/","title":{"rendered":"REQUIRED FRONT END DRAWINGS  (IN ADDITION TO DESIGN DRAWINGS)"},"content":{"rendered":"<div id=\"mega-menu-wrap-max_mega_menu_1\" class=\"mega-menu-wrap\"><div class=\"mega-menu-toggle\"><div class=\"mega-toggle-blocks-left\"><\/div><div class=\"mega-toggle-blocks-center\"><\/div><div class=\"mega-toggle-blocks-right\"><div class='mega-toggle-block mega-menu-toggle-animated-block mega-toggle-block-0' id='mega-toggle-block-0'><button aria-label=\"Toggle Menu\" class=\"mega-toggle-animated mega-toggle-animated-slider\" type=\"button\" aria-haspopup=\"true\" aria-expanded=\"false\" aria-controls=\"mega-menu-max_mega_menu_1\">\n                  <span class=\"mega-toggle-animated-box\">\n                    <span class=\"mega-toggle-animated-inner\"><\/span>\n                  <\/span>\n                <\/button><\/div><\/div><\/div><ul id=\"mega-menu-max_mega_menu_1\" class=\"mega-menu max-mega-menu mega-menu-horizontal mega-no-js\" data-event=\"hover_intent\" data-effect=\"fade_up\" data-effect-speed=\"200\" data-effect-mobile=\"disabled\" data-effect-speed-mobile=\"0\" data-mobile-force-width=\"false\" data-second-click=\"go\" data-document-click=\"collapse\" data-vertical-behaviour=\"standard\" data-breakpoint=\"768\" data-unbind=\"true\" data-mobile-state=\"collapse_all\" data-mobile-direction=\"vertical\" data-hover-intent-timeout=\"300\" data-hover-intent-interval=\"100\"><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-home mega-align-bottom-left mega-menu-flyout mega-menu-item-588\" id=\"mega-menu-item-588\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/\">Home<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-align-bottom-left mega-menu-flyout mega-hide-arrow mega-menu-item-539\" id=\"mega-menu-item-539\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-539\">Overview<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n<ul class=\"mega-sub-menu\" id='mega-sub-menu-539'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-540\" id=\"mega-menu-item-540\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/development\/\">Guideline Process<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-541\" id=\"mega-menu-item-541\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/goals\/\">Guideline Goals<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-982\" id=\"mega-menu-item-982\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/greenway-usage-recommendations\/\">Usage Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-542\" id=\"mega-menu-item-542\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/user\/\">Designing for the User<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-543\" id=\"mega-menu-item-543\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/safety\/\">Safety and Security<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-544\" id=\"mega-menu-item-544\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/standard-flexible\/\">What is Standard and Flexible<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-545\" id=\"mega-menu-item-545\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/mindset\/\">Design Mindset<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-546\" id=\"mega-menu-item-546\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/recognizable\/\">Make Greenways Recognizable<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-547\" id=\"mega-menu-item-547\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/pre-design\/\">Pre-Design Evaluation<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-custom mega-menu-item-object-custom mega-menu-item-548\" id=\"mega-menu-item-548\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/11\/GRG-Construction-Plans-Checklist-and-Deviation-Form.pdf\">Design\/Construction Plans Checklist<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-549\" id=\"mega-menu-item-549\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/additional-design-resources\/\">Onboarding Resources<\/a><\/li><\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-align-bottom-left mega-menu-flyout mega-hide-arrow mega-menu-item-550\" id=\"mega-menu-item-550\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-550\">Trail Design Guidelines<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n<ul class=\"mega-sub-menu\" id='mega-sub-menu-550'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-551\" id=\"mega-menu-item-551\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/overarching-standards\/\">Overarching Standards<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-552\" id=\"mega-menu-item-552\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/shoulder-standards\/\">Trail Shoulder Standards<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-553\" id=\"mega-menu-item-553\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/layout-standards\/\">Layout Standards<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-566\" id=\"mega-menu-item-566\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/cross-sections\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-566\">Greenway Cross Sections<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-566'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-554\" id=\"mega-menu-item-554\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/standard-cross-section\/\">Standard Trail<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-555\" id=\"mega-menu-item-555\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/wet-flood\/\">Trail in Wet\/Flood Prone Areas<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-556\" id=\"mega-menu-item-556\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/shallow-slope\/\">Trail on Shallow Slope<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-557\" id=\"mega-menu-item-557\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/steep-slope\/\">Trail on Steep Slope<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-558\" id=\"mega-menu-item-558\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/roadway\/\">Trail by Roadway<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-559\" id=\"mega-menu-item-559\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/urban\/\">Trail in Urban Context<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-560\" id=\"mega-menu-item-560\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/boardwalk\/\">Boardwalk Trail<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-561\" id=\"mega-menu-item-561\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/underpass\/\">Trail at Bridge Underpass<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-562\" id=\"mega-menu-item-562\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/railway\/\">Trail Adjacent to Railway<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-563\" id=\"mega-menu-item-563\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/standard-cross-section-secondary-path\/\">Secondary Path<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-567\" id=\"mega-menu-item-567\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/neighborhood\/\">Trail through Neighborhood<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-564\" id=\"mega-menu-item-564\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/stream\/\">Trail Adjacent to Stream<\/a><\/li>\t<\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-568\" id=\"mega-menu-item-568\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/intersections-and-crossings\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-568\">Intersections and Crossings<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-568'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-570\" id=\"mega-menu-item-570\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/major-intersection\/\">Major Intersection with Bike Lane<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-569\" id=\"mega-menu-item-569\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/greenway-major-intersection-turn-recommended-layout\/\">Major Intersection with Turn<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-571\" id=\"mega-menu-item-571\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/mid-block\/\">Major Street Mid-Block<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-578\" id=\"mega-menu-item-578\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/minor-mid-block\/\">Minor Street Mid-Block<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-577\" id=\"mega-menu-item-577\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/minor-mid-block-parking\/\">Minor Street Mid-Block with Parking<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-579\" id=\"mega-menu-item-579\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/mid-block-crossing-angled-pedestrian-refuge\/\">Mid-Block Crossing - Angled Pedestrian Refuge<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-580\" id=\"mega-menu-item-580\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/minor-street-t\/\">Minor Street T-Intersection<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-582\" id=\"mega-menu-item-582\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/major-trail\/\">Major Trail Connection<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-581\" id=\"mega-menu-item-581\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/minor-trail-connection-standard-layout\/\">Minor Trail Connection<\/a><\/li>\t<\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-734\" id=\"mega-menu-item-734\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/trail-nodes\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-734\">Trail Nodes<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-734'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-733\" id=\"mega-menu-item-733\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/major-trailhead-recommended-layout\/\">Major Trailhead - Recommended Layout<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-735\" id=\"mega-menu-item-735\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/minor-trailhead\/\">Minor Trailhead - Recommended Layout<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-737\" id=\"mega-menu-item-737\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/gateways\/\">Gateway - Recommended Layout<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-736\" id=\"mega-menu-item-736\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/greenway-intersection\/\">Major Greenway Intersection - Recommended Layout<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-739\" id=\"mega-menu-item-739\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/seating-node\/\">Large Seating Node - Recommended Layout<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-738\" id=\"mega-menu-item-738\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/small-seating-nodes\/\">Small Seating Node - Recommended Layout<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-740\" id=\"mega-menu-item-740\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/bicycle-parking\/\">Bicycle Parking - Recommended Layout<\/a><\/li>\t<\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-746\" id=\"mega-menu-item-746\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/surfacing\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-746\">Surfacing<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-746'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-742\" id=\"mega-menu-item-742\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/surfacing-primary-trail\/\">Surfacing Standards - Primary Trail<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-741\" id=\"mega-menu-item-741\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/surfacing-secondary-path\/\">Surfacing Standards - Secondary Path<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-744\" id=\"mega-menu-item-744\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/surfacing-standards-roadway-service-drives\/\">Surfacing Standards - Roadway \/ Service Drives<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-745\" id=\"mega-menu-item-745\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/specialty-pavements\/\">Surfacing Basis of Design - Specialty Pavements<\/a><\/li>\t<\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-747\" id=\"mega-menu-item-747\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/trail-structures-furnishings\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-747\">Trail Structures & Furnishings<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-747'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-748\" id=\"mega-menu-item-748\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/masonry-walls-seat-walls-retaining-walls-recommendations\/\">Masonry Walls, Seat Walls, Retaining Walls - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-749\" id=\"mega-menu-item-749\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/modular-concrete-masonry-unit-walls-recommendations\/\">Modular and Concrete Masonry Unit Walls - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-750\" id=\"mega-menu-item-750\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/concrete-stem-wall-recommendations\/\">Concrete Stem Wall - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-751\" id=\"mega-menu-item-751\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/boulder-ledge-rock-walls\/\">Boulder \/ Ledge Rock Wall - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-752\" id=\"mega-menu-item-752\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/bridges-landings\/\">Bridges & Landings<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-753\" id=\"mega-menu-item-753\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/bridge-abutment-standards\/\">Bridge Abutment - Standards<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-754\" id=\"mega-menu-item-754\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/shelters-pavilions\/\">Shelters \/ Pavilions - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-755\" id=\"mega-menu-item-755\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/handrails-basis-design\/\">Handrails - Basis of Design<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-756\" id=\"mega-menu-item-756\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/fencing\/\">Fencing - Basis of Design<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-757\" id=\"mega-menu-item-757\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/contemporary-furnishings\/\">Contemporary Furnishings - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-758\" id=\"mega-menu-item-758\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/historic-furnishings\/\">Historic Furnishings - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-759\" id=\"mega-menu-item-759\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/transitional-furnishings\/\">Transitional Furnishings - Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-760\" id=\"mega-menu-item-760\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/trail-design\/drinking-fountain-install\/\">Drinking Fountain - Installation Detail<\/a><\/li>\t<\/ul>\n<\/li><\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-align-bottom-left mega-menu-flyout mega-hide-arrow mega-menu-item-573\" id=\"mega-menu-item-573\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-573\">Environmental Design Guidlines<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n<ul class=\"mega-sub-menu\" id='mega-sub-menu-573'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-761\" id=\"mega-menu-item-761\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/stormwater-grading-considerations\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-761\">Stormwater and Grading Considerations<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-761'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-762\" id=\"mega-menu-item-762\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/stormwater-bmp-selection-recommendations\/\">Stormwater BMP Selection Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-763\" id=\"mega-menu-item-763\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/bioretention-raingarden\/\">Bioretention \u2013 Rain Garden \u2013 Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-764\" id=\"mega-menu-item-764\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/standard-cross-section-trail-bmp\/\">Standard Cross Section - Trail with BMP<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-765\" id=\"mega-menu-item-765\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/permeable-pavement\/\">Permeable Pavement- Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-766\" id=\"mega-menu-item-766\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/amended-soils-disconnection-recommendations\/\">Amended Soils Disconnection- Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-767\" id=\"mega-menu-item-767\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/ponds-wetlands\/\">Stormwater Ponds and Wetlands- recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-768\" id=\"mega-menu-item-768\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/bioretention-stormwater-control-swales-recommendations\/\">Bioretention \u2013 Stormwater Control Swales-  Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-769\" id=\"mega-menu-item-769\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/temporary-bank-stabilization-strategies\/\">Temporary Bank Stabilization Strategies<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-770\" id=\"mega-menu-item-770\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/permanent-bank-stabilization\/\">Permanent Bank Stabilization Recommendations<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-771\" id=\"mega-menu-item-771\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/stream-stabilization-techniques\/\">In-Stream Stabilization Techniques<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-772\" id=\"mega-menu-item-772\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/culverts-piping-standards\/\">Culverts and Piping \u2013 Standards<\/a><\/li>\t<\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-773\" id=\"mega-menu-item-773\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/trail-planting-guidelines\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-773\">Trail Planting Guidelines<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-773'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-790\" id=\"mega-menu-item-790\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/planting-vision-goals\/\">Planting Vision & Goals<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-791\" id=\"mega-menu-item-791\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/planting-anatomy\/\">Planting Anatomy<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-792\" id=\"mega-menu-item-792\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/recommended-matrix-planting-strategies\/\">Recommended Matrix of Planting Strategies<\/a><\/li>\t<\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-775\" id=\"mega-menu-item-775\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/typical-planting-design\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-775\">Typical Planting Design<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-775'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-776\" id=\"mega-menu-item-776\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/soil-preparation\/\">Soil Preparation<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-777\" id=\"mega-menu-item-777\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/standard-turf-shoulder\/\">Standard Turf Shoulder<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-778\" id=\"mega-menu-item-778\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/recommendations-turf-lawn-high-mow-lawn\/\">Recommendations for Turf Lawn \/ High Mow Lawn<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-779\" id=\"mega-menu-item-779\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/native-grassland-planting\/\">Recommendations for Native Grassland Planting<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-780\" id=\"mega-menu-item-780\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/recommendations-native-shrub-perennial-beds\/\">Recommendations for Native Shrub and Perennial Beds<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-781\" id=\"mega-menu-item-781\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/recommendations-woodland-forest-planting\/\">Recommendations for Woodland \/ Forest Planting<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-782\" id=\"mega-menu-item-782\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/streambank-planting\/\">Recommendations for Streambank Planting<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-783\" id=\"mega-menu-item-783\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/wetland-pond-edge-planting\/\">Recommendations for Wetland \/ Pond Edge Planning<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-784\" id=\"mega-menu-item-784\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/bioretention-rain-garden\/\">Recommendations for Bioretention \/ Rain Garden<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-menu-item-785\" id=\"mega-menu-item-785\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/tree-planting\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-785\">Standards for Tree Planting<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n\t\t<ul class=\"mega-sub-menu\" id='mega-sub-menu-785'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-786\" id=\"mega-menu-item-786\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/standards-tree-planting-root-barriers\/\">Root Barriers<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-787\" id=\"mega-menu-item-787\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/standards-tree-planting-soil-volume-tree-health\/\">Soil Volume for Tree Health<\/a><\/li>\t\t<\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-788\" id=\"mega-menu-item-788\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/tree-staking\/\">Standards for Tree Staking<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-789\" id=\"mega-menu-item-789\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/shrubs-ornamental-grasses-perennials\/\">Shrubs, Ornamental Grasses, & Perennials<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-793\" id=\"mega-menu-item-793\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/environmental\/bed-edges\/\">Recommendations for Bed Edges<\/a><\/li>\t<\/ul>\n<\/li><\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-has-children mega-align-bottom-left mega-menu-flyout mega-hide-arrow mega-menu-item-574\" id=\"mega-menu-item-574\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/construction\/\" aria-expanded=\"false\" aria-controls=\"mega-sub-menu-574\">Pre-Construction & Construction<span class=\"mega-indicator\" aria-hidden=\"true\"><\/span><\/a>\n<ul class=\"mega-sub-menu\" id='mega-sub-menu-574'>\n<li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-799\" id=\"mega-menu-item-799\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/required-front-end-drawings-addition-design-drawings\/\">Required Front End Drawings (In Addition to Design Drawings)<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-795\" id=\"mega-menu-item-795\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/construction\/erosion-control-stormwater-pollution-prevention-plan-swppp\/\">Erosion control and stormwater pollution prevention plan (SWPPP)<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-796\" id=\"mega-menu-item-796\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/construction\/testing-quality-assurance\/\">During Construction \u2013 Testing & Quality Assurance<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-797\" id=\"mega-menu-item-797\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/construction\/construction-mock-ups\/\">During Construction \u2013 Mockups<\/a><\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-menu-item-798\" id=\"mega-menu-item-798\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/construction\/construction-checkpoints\/\">During Construction \u2013 Checkpoints<\/a><\/li><\/ul>\n<\/li><li class=\"mega-menu-item mega-menu-item-type-post_type mega-menu-item-object-page mega-align-bottom-left mega-menu-flyout mega-menu-item-587\" id=\"mega-menu-item-587\"><a class=\"mega-menu-link\" href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/overview\/additional-design-resources\/\">Onboarding Resources<\/a><\/li><\/ul><\/div>\n<h4>LIMITS OF DISTURBANCE<\/h4>\n<ul>\n<li>Can be included in other drawing<\/li>\n<li>Limits of disturbance should be clearly indicated on drawings. Contractor to provide orange construction fencing along the entire length of trail at the limit line.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-493 aligncenter\" src=\"https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings1-300x273.png\" alt=\"\" width=\"435\" height=\"396\" srcset=\"https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings1-300x273.png 300w, https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings1.png 700w\" sizes=\"auto, (max-width: 435px) 100vw, 435px\" \/><\/p>\n<hr \/>\n<h4>LAYDOWN AREA LOCATION AND ACCESS PLANS<\/h4>\n<ul>\n<li>Designer to provide preliminary plan for construction laydown area locations and access routes, including:\n<ul>\n<li>Turn around areas for trucks and equipment are to be provided at each end of the trail (or before areas to be bridged).<\/li>\n<li>Passing lanes are to be provided at 1\/4 mile intervals and can also serve as laydown areas, as needed.<\/li>\n<\/ul>\n<\/li>\n<li>Contractor to provide final plan for laydown area locations and access routes with agreements and\/ or permits for work in road, railroad right-of-way, or other as needed.<\/li>\n<li>Include restoration plan- repair of areas disturbed to include loosening of compacted soils and subgrade soils.<\/li>\n<li>Construction laydown areas should be shown on overall site plan.<\/li>\n<\/ul>\n<hr \/>\n<h4>STORMWATER POLLUTION PREVENTION PLAN (SWPPP)<\/h4>\n<ul>\n<li>A SWPPP or erosion control plan appropriate to the project size and location shall be provided. Temporary and permanent sediment controls should be considered early in the design process, so that temporary controls can become part of permanent stormwater controls.<\/li>\n<li>Plan should be executed early in design process requirements should be envisioned as part of finished implementation. For example, run off gravel roads can become part of final trail installation. Sedimentation basins can become final BMP locations.<\/li>\n<li>Seed immediately after an area is complete, potentially seeding with annual cover crop before natives establishment. (Designers to include a restoration\/ seeding plan as needed)<\/li>\n<li>See <a href=\"https:\/\/greatriversgreenway.org\/design\/design-guidelines\/construction\/erosion-control-stormwater-pollution-prevention-plan-swppp\/\" target=\"_blank\">Erosion Control and Stormwater Pollution Prevention Plan<\/a><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-494\" src=\"https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings2-300x273.png\" alt=\"\" width=\"618\" height=\"562\" srcset=\"https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings2-300x273.png 300w, https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings2.png 700w\" sizes=\"auto, (max-width: 618px) 100vw, 618px\" \/><\/p>\n<hr \/>\n<h4>TREE PROTECTION PLAN<\/h4>\n<ul>\n<li>A clear tree protection plan should be included in construction documents and coordinated with the selected contractor. All trees falling within the limits of work should be protected during construction.<\/li>\n<\/ul>\n<hr \/>\n<h4>SOILS PLAN<\/h4>\n<ul>\n<li>Indicates areas of soil preparations based on existing soils testing conditions and proposed landscape improvements.<\/li>\n<li>Preservation and stockpile of topsoil to be used for finished grading.<\/li>\n<\/ul>\n<hr \/>\n<h4>TRAFFIC CONTROL PLAN<\/h4>\n<ul>\n<li>Indicating routing for all modes of transportation during construction, not just vehicular access.<\/li>\n<li>Should be done as part of construction staging plan.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-495 aligncenter\" src=\"https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings3-269x300.png\" alt=\"\" width=\"564\" height=\"629\" srcset=\"https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings3-269x300.png 269w, https:\/\/greatriversgreenway.org\/design\/wp-content\/uploads\/sites\/2\/2024\/05\/drawings3.png 701w\" sizes=\"auto, (max-width: 564px) 100vw, 564px\" \/><\/p>\n<hr \/>\n<h4>WATERSHED PLAN<\/h4>\n<ul>\n<li>May be required per MSD<\/li>\n<\/ul>\n<hr \/>\n<h4>SUBMITTAL LOG\/ CHECKLIST<\/h4>\n<ul>\n<li>Designer\/ engineer to prepare submittal log for all items requiring submittals by contractor.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>LIMITS OF DISTURBANCE Can be included in other drawing Limits of disturbance should be clearly indicated on drawings.<\/p>\n","protected":false},"author":3,"featured_media":0,"parent":0,"menu_order":75,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-492","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/greatriversgreenway.org\/design\/wp-json\/wp\/v2\/pages\/492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greatriversgreenway.org\/design\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/greatriversgreenway.org\/design\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/greatriversgreenway.org\/design\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/greatriversgreenway.org\/design\/wp-json\/wp\/v2\/comments?post=492"}],"version-history":[{"count":0,"href":"https:\/\/greatriversgreenway.org\/design\/wp-json\/wp\/v2\/pages\/492\/revisions"}],"wp:attachment":[{"href":"https:\/\/greatriversgreenway.org\/design\/wp-json\/wp\/v2\/media?parent=492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}