Description
For now, this stretch of the Deer Creek Greenway lies entirely within the new Brentwood Park in the City of Brentwood. The final section of greenway (between Brazeau Avenue and Marshall Avenue, parallel to the east side of Brentwood Blvd) is under construction. When this final link is complete at the end of 2024, the greenway in Brentwood Park will connect to the larger Deer Creek Greenway—linking the cities of Maplewood, Brentwood and Webster Groves.
See the full plan for this greenway here!
Get Directions to Deer Creek Greenway: Brentwood Park
Getting There
Right now, this part of the Deer Creek Greenway lies entirely within Brentwood Park. ( 2924 Brazeau Ave. Brentwood, MO 63144)
If you are driving, please enter the park from Brentwood Blvd. via East Pendleton Ave. and turn right onto Brazeau Ave. The entrance from Brentwood Blvd. is under construction.
If you are walking or riding a bike, you can enter the park on the greenway at the intersection of Manchester and Hanley Rd, (just west of the Maplewood Metrolink Station.) You can also enter via the underpass beneath Manchester Road from Rogers Parkway (a community trail north of Manchester Rd.)
The sidewalk on Brentwood Blvd. between Marshall Avenue and the new Brentwood Park is CLOSED to accommodate construction of the Deer Creek Greenway connector. Work is expected to be complete in December 2024.
This section of greenway is managed by the City of Brentwood. Please be sure to follow all posted rules and regulations while you are living life outside!
Things to Do
Play There is an amazing 2.7 acre destination playground with a splash pad, water features and much more!
WaterwaysThis park is part of the Brentwood Bound projects that aim to mitigate flooding in Brentwood. Brentwood Park was designed to restore the Deer Creek floodplain within Brentwood. In the event of flooding, the lower part of the park along Deer Creek is designed to contain water as the natural floodplain would.
Trail Details
1.4 Miles
This paved, accessible trail currently meanders a total of 1.4 miles; between Brentwood Blvd. to the intersection of Hanley and Manchester Rd, near the Maplewood MetroLink Station. It also connects to a new underpass beneath Manchester Road that links to Rogers Parkway, a Brentwood community trail. When the final segment between Marshall Avenue and Brazeau Avenue is complete in late 2024, the Deer Creek Greenway in Brentwood Park will be connected to the existing 3.4 mile Deer Creek Greenway in Webster Groves and Maplewood.
Download the Guide
Amenities
Benches
Bike Racks
Drinking Water
Parking
Playground
Restrooms
Shelters
Tables
Trash
Upcoming Events
Saturday, October 26th
9:00 am - 12:00 pm
Saturday, November 2nd
9:00 am - 12:00 pm
Share Your Greenways Stories
Greenway stories are shared through art and signs, tours, digital content, outreach, and community events. These greenway stories are organized around themes of nature, culture, and history. Share your greenway story by visiting the Share Your Stories page or recording your story at 314-932-4904.
Share Your Story